The Alternative Fuels Infrastructure Regulation (AFIR) has applied since 13 April 2024. The title of many guides says 2025, but the regulation does not start in 2025: only some of its deadlines fall in 2025, 2026 and 2027. For a charge point operator (CPO), the useful question is which rules bind you directly and which are targets for Member States.
A regulation, not a directive
AFIR is Regulation (EU) 2023/1804. It is binding in its entirety and directly applicable, so there is no national transposition to wait for. It repealed the earlier directive (2014/94/EU) with effect from 13 April 2024.
Deployment targets: mostly addressed to Member States
The fleet-based targets in Article 3 are obligations on Member States, not on operators. They require at least 1.3 kW of public power per registered battery-electric light-duty vehicle and 0.80 kW per plug-in hybrid, measured at the end of each year from 2024.
Along the TEN-T network, the text sets minimums per recharging pool, meaning one or more stations on a given site:
These are deployment thresholds that Member States must secure. They are not a per-station obligation for every operator. Note also that 1.3 is a figure in kW per vehicle, not in MW per pool.
Payment and prices: what applies to your points
Article 5 is the part that lands on operators.
Connectivity, smart charging and data
Since 14 October 2024, public points must be digitally connected: able to exchange information in real time and to be monitored and controlled remotely. Public points built after 13 April 2024, or renovated after 14 October 2024, must be capable of smart charging, meaning the charging current can be adjusted in real time from information received electronically. Public DC points needed a fixed cable by 14 April 2025.
From 14 April 2025, operators must also make static and dynamic data available free of charge, including operational status, availability and ad hoc price, through an API declared to the national access point. The detail is in our article on AFIR data transparency.
What the text does not say
What to check this week
List your public points by power and by date of installation or renovation. Flag every point of 50 kW or more on a TEN-T corridor that still relies on a QR code before 1 January 2027. Confirm that each point is remotely controllable and publishes status and price data. GFO Omni is a CSMS that supervises charge points over OCPP 1.6, 2.0.1 and 2.1.